Case number:DCCJ 3878/2014
Premises:Harbour View Garden, 21 North St., Kennedy Town
Details: Affected premises had been suffered the water seepage from upper floor many years. Hence, the landlord engaged Silver Consultants to investigate the water seepage and we succeeded to identify the source of water seepage.
|
   
|
Case number:DCCJ 4468-2015
Premises: Wah Lung Industrial Building, Tsuen Wan
Details: Affected premises had been suffered the water seepage from the podium of the upper floor many years. Hence, the defendant engaged Silver Consultants and we succeeded to identify the source of water seepage. Finally, the court ordered the landlord of the upper floor to repair the water proof membrane of the podium and bear the plaintiff’s cost.
|
   
|
Case number:DCCJ 4803-2016
Premises:Kwai Lok Building, Kwai Chung
Details: Affected premises had been suffered the water seepage from upper floor many years. The Government department visited the flat and carried out their tests many times but still cannot find out the water source. Hence, the landlord engaged Silver Consultants to carry out a survey and we succeeded to identify the source of water seepage.
|
   
|
Case number:DCCJ 4919/17
Premises:Mei Wah Building, 164 Johnston Road
Details: Alternation work was carried by the landlord of upper floor to separated into four tidy rooms with toilets. There was water seepage found after the work. Government department cannot locate the source of water seepage. Hence, the landlord of the affected premises engaged Silver Consultants to identify the source and the problem was solve finally.
|
   
|
Case number:DCCJ 4959-2015
Premises:Sherwood Court, Happy Valley
Details: Affected premises had been suffered the water seepage from upper floor many years. The landlord of suspected premises engaged another survey company before and repair according to the findings. However, the water seepage problem did not solve. Hence, the landlord engaged Silver Consultants to carry out a site survey with water test. At last, the water seepage problem was solved.
|
   
|
Case number:DCCJ 3244-2015
Premises:King Lam House, Hong Lam Court, Sha Tin
Details: Affected premises had been suffered the water seepage from the bathroom of the upper unit many years. The source of water seepage had been identified after carrying the survey. Finally, the court ordered the landlord of the upper unit to repair and bear the respondent’s cost.
|
   
|
Case number:DCMP1310/2016
Premises:Tsat Tsz Mui Road, North Point, HK
Details:The landlord of Flat A complaint that there was seepage from the roof of flat B and sued the landlord of Flat B. Finally, the defendant engaged Silver Consultants to investigate the water seepage. It was found that there was water seepage from the roof of Flat A and Flat B at the same time. Finally, the plaintiff lost the case and have to bear the respondent’s cost.
|
   
|
Case number:SCTC000271/16
Premises:Whampoa Garden, Hung Hom
Details:The landlord of the affected premises complaint there was water seepage from upper unit. Government departments carried out the tests many times but cannot determine the source of water seepage. Finally, the defendant engaged Silver Consultants and we succeeded to identify the source of water seepage which was related to the external wall. Finally, the plaintiff lost the case and have to bear the respondent’s cost.
|
   
|
Case number:SCTC002198/18
Premises:Hoi Po Mansion, Riviera Gardens, Tsuen Wan
Details: The landlord of the affected premises complaint there was water seepage from upper unit. Government departments carried out the tests many times but cannot determine the source of water seepage. Finally, the defendant engaged Silver Consultants and we succeeded to identify the source of water seepage which was related to the external wall. Finally, the plaintiff dropped the case and the management office repaired the external wall to stop the water seepage.
|
   
|
Case number:SCTC036744/16
Premises:Phoenix Court, Beacon Hill, Kowloon Tong
Details: Affected premises had been suffered the water seepage from the bathroom of the upper unit many years. The source of water seepage had been identified after carrying the survey. Finally, the court ordered the landlord of the upper unit to repair the water facilities of the bathroom of the upper unit and bear the respondent’s cost.
|
   
|
Premises:Crescendo,Yuen Long
Details: There was staining found at the ceiling, flooring and external. After investigation by Silver Consultants, we found that there was no water proof membrane was applied to the roof and four washrooms which caused serious seepage problem. Finally, the landlord request the developer to repair accordingly and compensate for the lost.
|
   
|
Case number:DCCJ 1529/2017
Premises:Peaceful Mansion, Phase 12, Siena 2, Discovery Bay
Details: Affected premises had been suffered the water seepage from the podium of the upper floor many years. Hence, the defendant engaged Silver Consultants and we succeeded to identify the source of water seepage. Finally, the court ordered the landlord of the upper floor to repair the water proof membrane of the podium and bear the plaintiff’s cost.
|
|
Address: Belleview Drive, Repulse Bay
Details: The contractor delayed the work for few months unreasonably after receiving large portion of deposit. The landlord chose to end the contractor. Hence the landlord engaged Silver Consultants to carry out a site survey and estimate the amount payable to the contractor.
|
  
|
Case number:SCTC036744/16
Premises:Phoenix Court, Beacon Hill, Kowloon Tong
Details: The contractor delayed the work starting date after receiving the deposit. The work so called completed by the contractor was below normal standard. Many defects and mistakes were found. Hence the landlord engaged Silver Consultants to carry out a site survey and issue a surveyor report.
|
   
|
Case number:SCT048853/16
Premises:Sunshine City Phase 4, Ma On Shan
Details: Landlord hold the deposit of the tenant without reasonable reason. Hence the landlord engaged Silver Consultants to carry out a site survey and issue a surveyor report.
|
|
Case number:DCCJ 2924-2014
Premises:Fu Wo House, Fu Keung Court, Wong Tai Sin
Details: The contractor delayed the work starting date after receiving the deposit. The work so called completed by the contractor was below normal standard. Many defects and mistakes were found. Hence the landlord engaged Silver Consultants to carry out a site survey and issue a surveyor report.
|
   
|
Project:Water leakage investigation with loss estimation
Location:A building at Ma Tau Wai Road To Kwa Wan
Description:
- Use of high resolution thermal scanning to scanning the drainage system of the washroom and toilet
- Carry water ponding test with high penetrating fluorescent dye to the flat roof
- Use of moisture distribtuib method to the ceiling
- Provide loss estimation and remedial proposal
Result:Success to claim from IO and solve the seepage problem
|
|
Project:Water leakage investigation with loss estimation
Location:A resident building at Shum Shui Po
Description:
- Use of high resolution thermal scanning to scanning the drainage system of the washroom and toilet
- Carry water ponding test with high penetrating fluorescent dye to the flat roof
- Use of moisture distribtuib method to the ceiling
- Provide loss estimation and remedial proposal
Result:Success to claim and solve the seepage problem
|
|
Poject:Water leakage investigation with loss estimation
Location:Apartment at South HK Island
Description:
- Use of mircowave scanning to scan the floor slab of the kitchen
- Use of high resolution thermal scanning to scanning the drainage system of the washroom and toilet
- Carry water ponding test with high penetrating fluorescent dye to the flat roof
- Use of moisture distribtuib method to the ceiling
- Provide loss estimation and remedial proposal
Result:Success to find out the water leakage source
|
 |
Project:Loss Estimation to a renovation project Location: Beacon Hill, Kowloon Tong
Description:
- To carry a on site inspection and to estimate the loss due to the unsatisfied quality of the contractor
Result:Success to claim from the contractor
|
 |